CoverIndex

Power, Rail, Marine, Air

Winnipeg Hydro

1 picture · 1972

Founded
1906 (City Light and Power / City Hydro); named Winnipeg Hydro in 1964
Head office then
Civic Centre, Winnipeg, Manitoba

Winnipeg Hydro was the city’s utility for electricity, steam heat and street lighting. It built Pointe du Bois on the Winnipeg River, first unit in 1911, and Slave Falls downstream, first unit in 1931.

The city built its own plants so it would not depend on private power. Pointe du Bois is still running, and is Manitoba Hydro’s oldest station.

Why it mattered

Winnipeg built a public plant so the city would not depend on private power. Pointe du Bois, still running, is Manitoba Hydro's oldest generating station. Until 2002 the city utility and the provincial utility split Winnipeg and the rest of the province.

Now

Manitoba Hydro bought Winnipeg Hydro from the city in 2002. After that it was the sole electricity supplier in the province. Both river plants remain in the Manitoba Hydro fleet.

Sold (2002) · Now: Manitoba Hydro

Still open

  • Exact closing month is given as September 2002 in secondary round-ups; the statute and Manitoba Hydro date the purchase to 2002 without a day.
  • Purchase price is not stated in the Act or on Manitoba Hydro's history page; press reports of the 2002 bid are not used here.
Transmission tower against an orange sunset.

Winnipeg Hydro · 1972

Transmission tower against an orange sunset.

Sources

The pictures

References

All companies