

1972
Transmission tower against an orange sunset.
The company
The City of Winnipeg Hydro Electric System, based at the Civic Centre in Winnipeg, Manitoba, operated the city’s electrical, steam-heating, and street-lighting utilities.
p. 6
That year
In 1972 the Pointe du Bois and Slave Falls hydraulic plants produced 1,076 million Kwh at base load, and firm energy sales reached 1,551 million Kwh.
p. 8